B.1 Renovation
Stage 1.
Asbestos analysis.
Reconstruction of all wet real property units, water and drain vertical lines, electric vertical lines, new telephone, tv-antenna and data cables.
Stage 2.
Reconstruction of water and drain base lines
Reconstruction of sauna departments
Reconstruction of heat piping locks
Stage 3.
Reconstruction of windows (with route for fresh air in ventilation)
Stage 4.
Reparation of whole ventilation system
Stage 5.
Measuring and adjusts of heating elements and line locks, control adjusts in wintertime
Other coming repairs:
-roofs and isolation of roofs
-outside wires
-underdrainage
-balconies
-facade elements
Estimated costs:
Stage 1.
3.750.000 €, 480 €/m²
Stage 2.
882.800 €, 112 €/m²
Stage 3.
270.500 €, 35 €/m²
Stage 4.
20.000 €, 2,50 €/m²
Stage 5.
31.000 €, 4 €/m²
All together
4.954.300 €, 633,50 €/m²
Additional:
Costs for planning and authorities
46.000 €, 6 €/m²
-----------------
Хорошие девочки делают всё тоже что и плохие, но так как они хорошие, то они делают это хорошо
Я не блондинка, ни брюнетка
я не безе, не шоколад...
я просто дерзкая кокетка....
в душе которой сладкий яд....
|